[vc_row][vc_column][vc_column_text]Work is proceeding apace with all of the concrete now poured for foundations, and the first steelwork is in place for Block A, the junior teaching block. Over coming weeks, the steelwork will be erected on the other teaching blocks as well as the Administration/Hall block that will be adjacent to the main entrance.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][mk_gallery images=”387,386,385″ image_size=”full”][/vc_column][/vc_row]